Fryslân Wind Farm

2020

LOCATION:
Fryslân, Netherlands.

TYPE:
Pre-assembly Off-Shore

NO. OF TURBINES:
89 Siemens Gamesa SWT-DD-130 Wind Turbines

WIND CAPACITY:
383 MW

Construction of the Fryslân wind farm began in 2019 and it was finally commissioned in 2021. EIRTECK completed the pre-assembly electrical installation of the 89 Siemens Gamesa’s SWT-DD-130 turbines, each with a power generating capacity of 4.3 megawatts (MW).

Annually, the windfarm will produce some 1.5 terawatt hours* (1,500,000 megawatt hours). This is approximately 1.2% of the electricity use in the Netherlands, corresponding to the consumption of some 500,000 households.

Well done to the EIRTECK team for all their hard work throughout the project!